Island Line
509 services observed.
30-day operator performance
A simple look at how Britain’s train operators have performed over the last 30 days, using every eligible route and service we've observed for each operator, not a hand-picked sample.
The headline numbers
26 Oct – 24 Nov 2026
Updated 25 November 2026
509 services observed.
Share of observed services recorded as cancelled.
Change in on-time performance versus the previous 30-day window.
The top 10
On time means arriving no later than scheduled at the final calling point. Early arrivals count as on time.
How we work it out
We’ve deliberately kept the method simple so the numbers are easy to understand and operators are compared on the same basis.
We include every eligible route and observed service for every comparable passenger operator in scope over the last 30 days.
Each train gets one result at its final passenger stop, so longer routes don’t get extra weight.
Arriving at the final calling point no later than scheduled means on time. Early arrivals count too; there is no late-running grace period and no hidden score.
We recalculate once a day when the servers are quieter, then serve a lightweight snapshot.
Because it keeps the result understandable: every service counts once, the definition of “on time” is clear, and small samples are held back until there’s enough data to be useful.
Live Trains UK performance figures are based on services observed in our historical calling-point archive. The public comparison covers comparable passenger operators in the National Rail ecosystem and excludes metro, heritage/charter and feed-only operators. It is a simple consumer view of recent performance, not an official industry performance measure.