During this time, UK timetables will not include live updates from Darwin. Please treat the times shown as planned times. Check the live departure or arrival boards for delays, cancellations and platform changes before you travel.

Live Trains UK

30-day operator performance

Who’s running
most reliably?

A simple look at how Britain’s train operators have performed over the last 30 days, using every eligible route and service we've observed for each operator, not a hand-picked sample.

30 daysrolling view Dailyovernight refresh No laterthan scheduled

The headline numbers

What stands out?

27 Oct – 25 Nov 2026
Aktualisiert 26 November 2026

Highest on-time rate 87.7%

Island Line

555 services observed.

Lowest cancellation rate 0.8%

Merseyrail

Share of observed services recorded as cancelled.

Biggest 30-day improvement +3.4pp

Island Line

Change in on-time performance versus the previous 30-day window.

The top 10

On-time performance

On time means arriving no later than scheduled at the final calling point. Early arrivals count as on time.

  1. 1
    Island Line+3.4 pp
    5.9% cancelled1.5 min average delay555 services
    87.7%pünktlich
  2. 2
    Elizabeth line-5.2 pp
    4.6% cancelled1.5 min average delay20,207 services
    71.3%pünktlich
  3. 3
    Greater Anglia+2.9 pp
    1.0% cancelled1.2 min average delay38,388 services
    69.5%pünktlich
  4. 4
    Merseyrail-0.8 pp
    0.8% cancelled0.7 min average delay19,448 services
    68.5%pünktlich
  5. 5
    Transport for Wales-4.7 pp
    2.5% cancelled2.3 min average delay32,141 services
    66.3%pünktlich
  6. 6
    Heathrow Express-2.7 pp
    2.1% cancelled1.6 min average delay4,647 services
    61.6%pünktlich
  7. 7
    London Overground-4.7 pp
    5.5% cancelled1.0 min average delay46,059 services
    60.8%pünktlich
  8. 8
    Chiltern Railways+2.5 pp
    1.8% cancelled1.9 min average delay10,566 services
    60.6%pünktlich
  9. 9
    Great Western Railway-1.7 pp
    2.7% cancelled2.6 min average delay54,686 services
    56.6%pünktlich
  10. 10
    Caledonian Sleeper-9.1 pp
    0.8% cancelled11.0 min average delay256 services
    54.3%pünktlich

How we work it out

One train.
One outcome.

We’ve deliberately kept the method simple so the numbers are easy to understand and operators are compared on the same basis.

1

Count every eligible route

We include every eligible route and observed service for every comparable passenger operator in scope over the last 30 days.

2

Count it once

Each train gets one result at its final passenger stop, so longer routes don’t get extra weight.

3

Keep “on time” strict

Arriving at the final calling point no later than scheduled means on time. Early arrivals count too; there is no late-running grace period and no hidden score.

4

Refresh overnight

We recalculate once a day when the servers are quieter, then serve a lightweight snapshot.

Why do it this way?

Because it keeps the result understandable: every service counts once, the definition of “on time” is clear, and small samples are held back until there’s enough data to be useful.

Live Trains UK performance figures are based on services observed in our historical calling-point archive. The public comparison covers comparable passenger operators in the National Rail ecosystem and excludes metro, heritage/charter and feed-only operators. It is a simple consumer view of recent performance, not an official industry performance measure.